GeoMx DSP Hibernating Procedure for Extended Shutdown

If the GeoMx DSP instrument will not be in use for 2 weeks or more, we recommend following this hibernation procedure to flush the fluidic lines of instrument buffers and replace the lines with DEPC-treated water. When ready, the system can be returned to operational following the second portion of this procedure.